My WES30 Installation
The big moment, installation and commissioning of your WES30.
After
months and sometimes even years of preparation everything is installed
on site and your WES30 starts to produce its first profitable and clean
energy. The installation of a WES30 wind turbine is something special,
often local press is invited to cover the event.
WES30 wind
turbines can be installed and put into service within a week. Your WES
dealer takes care of project management and makes sure all the right
people are on site and are prepared for their job. If needed WES
engineers come over to supervise the installation and assist with the
commissioning of your WES30.
During the first part of the
installation the tower segments are connected and are placed on the
foundation. During the next step the nacelle, rotor and blades are
assembled and placed on top of the tower. All bolts and nuts get the
right predefined torque to make sure the mechanical dynamics of the
structure is within specs.
The electrical and Internet part
comes last. Before putting the WES30 in full operation all electrical
connections from turbine to control cabinet and grid have to be made
and tested. During commissioning all systems and subsystems are tested,
special attention is paid to the safety systems.
Within 500
hours after commissioning a maintenance job is done on site to complete
the installation. After this "first 500 hour maintenance job" regular
maintenance and monitoring over the Internet done by your dealer makes
sure your WES30 keeps producing clean electricity for more than 20
years.
|
|
 |
Blade check at height.
|
 |
|
Installation team working at height. |
 |
Nacelle placed on lattice tower.
|
|