My WES30 Hoisting
WES30 hoisting is a job for experts and needs to be well prepared.
Your
local WES dealer will select a local hoisting expert and they will make
a hoisting plan for your WES30 wind turbine. If needed a member of the
WES project team will be on site to assist during hoisting or hoisting
preparation.
Many different questions need to be answered when a hoisting plan is made, the most important ones are:
- On what kind of soil will the crane operate?
- Are access road and working platform sufficient or is additional excavation needed?
- What crane is the best fit for the job?
- In which weather conditions is hoisting possible?
- How to offload the turbine from the truck or container?
- How to move the different components around on site?
- How to assemble sub components?
- How to assemble the complete turbine?
- How many people are needed on site and what kind of equipment is needed?
- How do the people communicate during hoisting?
- What safety regulations apply on site?
A
WES30 wind turbine with a tubular tower can be erected using only one
crane. A WES30 lattice tower can be erected without a crane.
Ropes, pulleys, winches, some temporary constructions and manpower
allow you to construct the lattice tower without the need for a crane.
Once the lattice tower has been erected the nacelle and rotor have to
be lifted and connected with a crane. Installing a WES30
on a lattice tower without a crane is also a job that needs to be
prepared by your local WES dealer and the local construction team. If
needed the WES project team can be involved. |
|
 |
|
Rotor and blades are placed. |
 |
|
Nacelle is lifted. |
 |
|
Nacelle, rotor and blades are lifted. |
|